BEGIN:VCALENDAR
VERSION:2.0
METHOD:PUBLISH
PRODID:-//ddaysoftware.com//NONSGML DDay.iCal 1.0//EN
BEGIN:VEVENT
DESCRIPTION:The trail follows Centennial Trail #89 and Flume Trail #50.  Wa
 lk through two tunnels.  Old flume beds with interpretive descriptions on 
 the walk.  Walk across dam to spillway built as WPA project with CCC.  5K/
 11K directions to follow.
DTEND;VALUE=DATE:20130929
DTSTAMP:20130618T164322
DTSTART;VALUE=DATE:20130928
LOCATION:Hill City
SEQUENCE:0
SUMMARY:Flume Trail at Sheridan Lake
UID:0864da10-a057-4529-a30d-52a559b5a563
END:VEVENT
END:VCALENDAR
